Saturday, April 30, 2011

This is the first attempt at blogging....so what better way to do it then with a Home Reno!

We are going to be remodeling 3 (out of our 4) bathrooms as they are in dire need of an update (unless you're a fan of the pink bathtub!).

Here is the current state of affairs:

Master Bathroom is getting a major overhaul




As is the En Suite




The Powder Room is receiving a face lift as well



Here is what to expect:

Master Bathroom:
- tub is getting ripped out and replaced with a shower only
- new tiles on shower and floor
- no shower door, just a 3/4 glass partition
- new counter tops
- new sink
- new fixtures in shower and sink
- new ventilation system

En Suite:
- new floor tiles
- new counter top
- new sink
- new tap
- new toilet

Powder Room
- new floor tiles
- new tap

THE CHANGES HAVE ALREADY BEGUN!

We have picked out the tile. It will be the same tile on all floors and shower walls for uniformity. 















The counter tops have been selected and ordered (it's hard to shoot a reflective surface, but is a nice brown marble pattern)







The fixtures are determined too 

En Suite tap

Shower tap  


Master Bathroom tap


Powder Room tap


En Suite sink














Master Bath sink



Well that's it for now...

We wait for the marble shower insert and counter tops to be delivered.

In a couple weeks time the demo starts....and the fun! Till then...

Kev and Kel